A Business Information System(Program) Phase 1 Instructions
Create/program an “information system (IS) component that solves a business need.
Main detailed instructions attached!!!
When half-way finished with phase 1 complete these set of instructions below!!!
This peer review discussion board allows you the opportunity to showcase your design and build ahead of each of the three capstone project phase submissions and receive peer feedback from the rest of the class. (Provide introduction of information system and documents of whats been programmed so far) CSIS 483
Capstone Deployment Phase Assignment Instructions
Overview
The capstone project assesses the program outcomes through a conclusion information system (IS) component that solves a business need. Each phase of the project should include one Microsoft Word document that follows APA guidelines and one zip file containing the applicable programming code, development material, and/or system configuration. Instructions
I. General Outline
a. APA formatted paper
b. Cover page
c. Table of Contents (TOC)
d. Introduction and conclusion sections
e. Each section must be well supported with the textbook, respected industry whitepapers, and scholarly information systems journal articles
II. Project Solution
a. Zip file including all work completed for the customer associated with the WBS that parallel the assigned modules/week. For example:
i. WBS indicates 10 project tasks will occur during the assigned weeks leading up to the due date of this phase of the capstone, all code necessary to complete these tasks is necessary to include for credit
III. UAT Results Report
a. Observation
i. Discuss the observation notes that were taken during the system testing.
b. Data Analysis
i. Benchmark your application and/or system development against existing industry best practices, frameworks, and/or standards
ii. Discuss the resulting data from benchmarking your IS system
IV. Deployment Plan and Report
a. Create a detailed deployment plan for your new IS using the concepts learned in the assigned chapter.
***Be sure to include screenshots of your working application in this write-up.
Submit this assignment by 11:59 p.m. (ET) on Monday of Module:Week 5.